Languages

References - Industrial > Ganja Automotive Plant

Ganja Automotive Plant
Ganja

Project details:

  •      Year of installation and start-up: october 2007
  •      Heating area: 20.000 m2
  •      External temperature: -15°c
  •      Required internal temperature: 18°c
  •      Maximum height: 12m

Relevant details:
72 PANRAD mod. FRB5 fuel G20    

Vantaggi

The industry requires powerful cooling systems and effective, because the livability has a direct influence on the productivity of people. At the same time, however, for large spaces and volumes at stake, every company must be able to rely on maximum efficiency, to avoid wastage and consequent unsustainable costs.
A radiant system Fraccaro can reduce energy consumption up to 60%, with a sharp cut of the energy burden on the budgets.
Read in detail the irradiation benefits for your business.