Languages

References - Industrial > China Southern Airlines

China Southern Airlines
Urumqi

Project details:

  • Year of installation and start-up: 2006
  • Heating area: 10.500 m2
  • External temperature: - 26°C
  • Internal temperature: range from 18°C to 25°C to melt the ice on the aircrafts when they get into the hangar
  • Maximum height: 35m

Relevant details:
19 GIRAD radiant modules 300kW 3 stages

Vantaggi

The industry requires powerful cooling systems and effective, because the livability has a direct influence on the productivity of people. At the same time, however, for large spaces and volumes at stake, every company must be able to rely on maximum efficiency, to avoid wastage and consequent unsustainable costs.
A radiant system Fraccaro can reduce energy consumption up to 60%, with a sharp cut of the energy burden on the budgets.
Read in detail the irradiation benefits for your business.

Prodotti

Related products
example of radiant circuit
GIRAD
Radiant modules